2020 NEC · 8th Edition building book · Not the same year
Jacksonville electrical work is on the 2020 National Electrical Code even though the building volume is the 8th Edition
The Building Inspection Division’s code list does not give electrical the same edition year as the building volume. Building, residential, plumbing, mechanical, fuel gas, and energy are the Florida Building Code, 8th Edition (2023). Electrical is listed as NFPA 70, the 2020 National Electrical Code. A specification written to a 2023 electrical book is a clash to flag. It is not a book to silently substitute. The division is the enforcing agency. No street address from that page is repeated here.
Service gear, feeders, and branch circuits stay in separate groups. Lighting fixtures are counts by type from the lighting plan. Devices are counts from the power plan. Conduit and conductors are extended where the riser gives a size and a path. A homerun with no length is left open. Panel schedules that disagree with the one-line are reported rather than averaged.
Photovoltaic equipment and electric-vehicle spaces are counts only from the sheets that show them. Jacksonville’s sun is not a module. Fire alarm and telecom stay out of a power-only bid. Temporary construction power is a means line only if you request it. Surge gear is a count when the one-line tags it.
Electricians in the Jacksonville wage area are published at $27.81 an hour on file OEUM002726000000047211103. The figure is not a conduit price. The state does not impose a prevailing-wage statute on private work. An assisted public contract can still name a determination. Read that contract before you reuse this hourly figure as a labor rate.
Generator and transfer equipment are counts from the equipment schedule. Feeders serving that generator are not mixed into the house-service total. Lighting controls are counts from the control diagram. A missing diagram leaves the controls open. Underground laterals in a wet site are linear from the site electrical plan, and rock in that trench is a soils question, not an electrical one.
Forward the one-line, the panel schedules, and the lighting and power plans. No cover is removed from a panel.
A lightning-protection down conductor is counted only when the electrical sheets include that system. It is not assumed on a flat roof. Dock levelers and trailer positions that need power are counts from the site plan, and the leveler itself stays with the door or equipment package that buys it. A marina feeder, if this set is a riverfront building, is measured only when a marina electrical plan is attached. Parking-lot pole bases are counts from the site plan. House panels in a subdivision are one schedule per plan type, multiplied only by the count of that plan. A meter bank serving several units is common equipment and is measured once.
Electrical quantities before merging Jacksonville’s two edition years
Jacksonville electrical questions the edition split creates
Is the electrical code the 8th Edition Florida Building Code?
The division lists the 8th Edition for the building volume and lists NFPA 70, the 2020 National Electrical Code, for electrical work. They are not the same line on that page.
Will you reprice a 2023 electrical spec onto the 2020 book?
No. A spec that names a different edition is flagged. Conductors are extended only under the edition the drawings consistently use.
Is $27.81 a price per foot?
No. File OEUM002726000000047211103 is the metro hourly figure for Electricians.