One log per bid · State minimum versus local adoption · Remote
A Nashville bid list is not one code just because the wage survey uses one metro name
Support for a list of bids around Nashville is remote. There is no seat in the city. Each invitation is logged alone: the city on the cover, whether the set is a house or a commercial building, and the edition the cover names. The fire marshal minimums since 17 April 2025 put commercial work on the 2021 IBC and houses on the 2018 IRC and 2018 IECC. A city may adopt something else. The log does not force every Davidson County bid onto the minimum, and it does not invent a department name.
Murfreesboro and Franklin share the wage-survey name and do not share a permit counter. A sheet from one of them, stapled into a Nashville PDF, is flagged. Memphis is a different seismic and permit problem and is not this list’s default.
File OEUM003498000000013105103 places Cost Estimators at $41.21 an hour for Nashville-Davidson-Murfreesboro-Franklin. The occupation estimates. It is not a trade rate and not the fee. The January 2023 chart limits state prevailing wage to highway construction over $50,000 and says non-highway construction has none. A building bid is not given a highway wage. Federal assistance is read from that solicitation. The fee is a separate quote.
Karst in Middle Tennessee is a foundation question when the borings say so. It is not drawn under every slab on the list. Tornado exposure changes an assembly only when the specification names the assembly. Alternates sit on separate pages. A contingency figure is one you set.
A shell and a tenant package in one file are identified before they are priced. If the landlord line is never drawn, the gap is listed. Self-perform crews are split only where you say which crews are yours.
New Madrid seismic notes matter more toward Memphis than as a default multiplier on a Nashville frame. Bracing is counted from the structural sheets. It is not a percentage.
Pass the bid list and the first plan set. No pre-bid walk is attended.
A music-venue rigging plot is not a building quantity unless structural sheets size the beams. A Broadway storefront renovation is the storefront sheets only, not the floors above that stay. Phase lines on a campus plan are respected.
A Nashville venue rigging plot is not steel tonnage unless the structural sheets size the beams. A storefront renovation on a lower Broadway address is only the storefront sheets, not the floors above that remain. Campus phase lines are respected. Karst piers appear only when the borings in that invitation call for them.
A Nashville bid that mixes a historic storefront with a new rear addition gets two logs inside one invitation. The storefront keeps what the demo plan says remains. The addition is new quantities. A shared party wall is measured once. Allowances for unknown plaster thickness are carried only if you set the number. This desk does not invent a plaster depth.
Bid support before treating the Nashville survey as one permit office
Nashville bid-list questions the minimums leave open
Will every Nashville-area bid use the 17 April 2025 state minimums?
Those are the fire marshal minimums. A city can adopt a different edition. The log records the edition on each cover rather than forcing one book onto the list.
Does the wage survey make Franklin a Nashville permit?
No. Franklin and Murfreesboro are other cities inside the survey name. Their sheets are flagged.
Is $41.21 the fee?
No. Series OEUM003498000000013105103 is the survey hourly statistic for Cost Estimators.