One log per bid · 10 July 2025 book · Remote
An Austin bid list is not one code just because the wage survey uses one metro name
A dedicated estimator on an Austin list works from the drawings of each bid, remotely. There is no seat in a local office and no standing bid desk. Each invitation gets its own log: which city is the building official, which edition the cover sheet names, and which sheets were actually attached. Austin Development Services is the official inside the Austin city limit. Round Rock, Cedar Park, and San Marcos are not the same official, even though they share a wage-survey name.
Inside Austin, the local amendments effective 10 July 2025 adopt 2024 editions of the building, residential, energy, existing-building, and fire codes, plus the 2024 uniform mechanical code and the 2024 uniform plumbing code. The electrical row still footnotes the 2023 National Electrical Code and states that the 2026 edition became effective on 1 September 2026. A set issued before that date may still cite the earlier edition. The log records the edition the drawings name. It does not upgrade every open bid on the list.
Cost Estimators across Austin-Round Rock-San Marcos are published at $42.02 an hour on 2025 file OEUM001242000000013105103. That occupation is the estimator. It is not the electrician and it is not the pipefitter. Trade labor, when you want a priced column, comes from rates you supply. Texas Government Code chapter 2258 requires prevailing wages on public work for the state or a political subdivision. A private contract is outside that chapter. The fee to prepare the estimate is a separate written quote.
Self-perform divisions and subcontract divisions are split only where you say which crews are yours. Alternates stay on their own pages. A named hoist, a tower crane, or a street closure is a general-requirement line only when the invitation describes it. Contingency is a line you set. It is not invented here to make two bids look alike.
A school solicitation and a private clinic on the same afternoon do not share a wage basis. The public one is read for a wage determination. The private one is not given a public scale for neatness. Federal assistance, when the invitation mentions it, is a different attachment from the state chapter.
Forward the bid list, the plans for the bid you want measured first, and the city named on each cover. No pre-bid meeting is attended.
Bid support before treating the Austin metro as one code
Austin bid-list questions that stay on the log
Will every Austin-area bid use the 10 July 2025 amendments?
Only parcels reviewed by Austin Development Services. Neighboring cities in the same wage area adopt their own books. The cover sheet is what the log records.
Does the 2026 electrical code apply to a set drawn last spring?
The city table makes the 2026 NEC effective 1 September 2026 and still footnotes 2023. The estimate uses the edition the drawings name and flags a mismatch.
Is $42.02 the fee for the estimate?
No. File OEUM001242000000013105103 is a metro hourly figure for cost estimators. The fee is a separate quote.