Alternatives with a code path · Site scope stays if assigned · Remote
Portland alternatives stay inside the specialty code this application used, including the residential overlap through 31 March 2027
Value engineering on a Portland set is a written list of swaps, each tied to the sheet it would change and to the specialty-code volume that permit application used. A commercial swap is checked against the 2025 structural specialty code. A house swap is checked against the 2026 residential specialty code, or against the 2023 residential code when the application is still inside the window that closes on 31 March 2027. A swap that only works on the other book is labeled that way and is not offered as a save.
Deleting a stormwater planter is not a save when the invitation assigned the planter to this bid. Deleting a shear wall and replacing it with a percentage is not a save. The lateral pieces on the structural sheets stay until a revised detail replaces them. A flood assembly identified on the civil drawings is not removed because a nearby parcel is outside the flood map.
Glazing and insulation ideas use the energy form already in the set. Commercial forms follow the 2025 Oregon Energy Efficiency Specialty Code on ASHRAE 90.1-2022. House forms follow Oregon Chapter 11. An idea that needs a form you did not send is marked as needing that form. It is not given a quantity.
Series OEUM003890000000013105103 reports $44.34 an hour for Cost Estimators in the Portland-Vancouver-Hillsboro, OR-WA survey. That hourly note is not a credit amount. Public-fund tests from the January 2023 chart, including renovations over $50,000 and projects using $750,000 of public funds, are labor questions for a priced bid. They are not a reason to delete a measured assembly. Vancouver sheets are excluded from a Portland alternative list.
Each idea states what it removes, what it adds, and what it does not know. Owner fees that the bid form never printed are not invented as savings. The file is the list, the code tag on each idea, and the open items.
Scope alternatives before treating a Portland stormwater sheet as optional
Portland alternative questions
Will you drop stormwater to save money?
Only if your bid form lets that scope leave the contract. Assigned site work stays, or the exclusion is written in the open.
Can a house idea use the 2026 book when the permit is still on 2023?
The idea is labeled with the book it needs. It is not presented as if the other book were already the permit.
Is the estimator wage a savings rate?
No. $44.34 from OEUM003890000000013105103 is a metro labor statistic for Cost Estimators, not a credit.