A Portland estimate names the specialty code the application used, and it keeps stormwater out unless the bid form includes it
A Portland construction estimate is priced from the drawings, with one line on the assumption log for the book this permit application used. Portland Permitting & Development is the reviewer inside the city. Commercial sheets are taken against the 2025 Oregon Structural Specialty Code, written on a 2024 IBC base. House sheets are taken against the 2026 residential specialty code, written on a 2024 IRC base, unless the application is still using the 2023 residential code, which remains usable until 31 March 2027. Writing the wrong book changes which energy chapter feeds insulation and glazing quantities. It does not change a length that was scaled.
Planters, tanks, street trees, and erosion control are measured only when your bid form assigns that site package. Otherwise they stay off the building total and are named as excluded. East-side infill and a Northwest industrial renovation are measured as two lateral systems and two stormwater details when both arrive in one PDF. They are not averaged. A Vancouver, Washington sheet is another state and another permit office, and it is split out before any lump sum is priced.
Shear walls, drag struts, and anchorage are counted from the structural sheets. Cascadia design is that lateral system. A second seismic percentage is not added after those pieces are counted. Flood vents and raised construction are counted only when the flood map and the civil drawings identify this parcel. A river name on a location map is not a flood quantity.
Series OEUM003890000000013105103 reports $44.34 an hour for Cost Estimators across Portland-Vancouver-Hillsboro, OR-WA. Vancouver, Washington sits inside that statistic and outside Portland Permitting & Development. The figure is a labor-market note, not this fee. Oregon public work on the January 2023 chart has no single dollar threshold. Renovation public works are tested over $50,000, and a project using $750,000 of public funds is a public work regardless of the owner. The invitation is what gets read. A private bid does not inherit that test.
Inclusionary-housing charges and system-development charges are left off unless the bid form prints a number. This desk does not invent those fees and does not sit in a development services center. What you receive is division pricing, the specialty-code note, the site-scope note, and the gaps.
Construction estimates before combining a Portland building with a Vancouver sheet
Portland estimate questions
Which residential book is used on a Portland house?
The book the permit application used. The 2026 residential specialty code is current, and the 2023 residential code remains usable until 31 March 2027.
Are stormwater planters inside the building number?
Only when your bid form assigns them. Otherwise they are listed as excluded site scope.
Is $44.34 the fee?
No. OEUM003890000000013105103 is the hourly statistic for Cost Estimators. The fee is quoted from the size of the set.