F&K Estimatings Construction Estimating & Takeoffs

City code · Not a state IBC · Division pricing

A Denver cost estimate names the city’s 2025 code, because Colorado does not have one private building code

A Denver cost estimate prices the drawings, remotely. Colorado does not adopt one IBC for every private building. Counties and cities choose. Community Planning and Development’s 2025 Building and Fire Code is the Denver book: adopted 13 June 2025, second printing 24 November 2025, titled effective December 31, using 2024 I-codes except a 2021 energy code, and the 2026 NEC unamended. A mountain-county edition is not written onto this log. An Aurora cover is not a Denver cover.

Divisions follow the bid form you send. Allowances are carried as written. Schematic sets are labeled as budgets. A square-foot factor for “Front Range commercial” is not the deliverable. Roof systems that differ stay separate so a unit price has a place to land.

File OEUM001974000000013105103 places Cost Estimators at $45.89 an hour for Denver-Aurora-Centennial. The occupation estimates. It is not this fee and not a craft rate. The January 2023 chart limits the state prevailing-wage law to state-funded work over $500,000 and excludes CDOT from that statute, while CDOT projects follow their own federal practice. A private warehouse does not receive the state threshold as a wage. Billing is a separate quote.

Expansive clay and claystone become piers or a structural floor only when this geotech calls for them. Hail-rated roofing is counted when the specification requires it, not because the Front Range sees hail. Wildfire assemblies are counted when the drawings put the parcel in that condition.

Alternates sit on their own pages. A crane is a general-requirement line only when the invitation describes it. Debris-diversion rules effective 1 September 2026 are a permit condition, not a quantity and not a dollar amount this estimate invents.

Snow is taken from the structural notes. The city’s hazard tool is not re-run here, and the city says it is not the wind tool.

Hand off the drawings and the bid form. No pre-bid conference is attended.

A GMP allowance schedule is carried as the owner wrote it. Winter concrete protection is a means plug only when you give a duration. Rock excavation is not filled in from a Front Range average.

Cost estimates before treating Colorado as one building code

Denver pricing questions the missing state code creates

Which statewide building code should the estimate assume?

None for a private building. Denver uses the 2025 city code described on the Community Planning and Development page. Another Colorado jurisdiction can differ.

Does every public project over $500,000 carry the state wage?

The January 2023 chart limits that statute to state-funded work over $500,000 and excludes CDOT. Read the solicitation. A private job does not inherit it.

Is $45.89 the fee?

No. Series OEUM001974000000013105103 is the survey hourly statistic for Cost Estimators.

Denver pricing references

Hand off the Denver drawings and bid form

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.