Tarrant County · Dallas–Fort Worth–Arlington · Planning & Development Services Department
Arlington permits are a Tarrant County city review, not a Dallas review
Arlington is in Tarrant County, inside the same census metro as Dallas and Fort Worth and under none of their building officials. Permits are taken in by the city’s Planning & Development Services Department, including its permitting and inspections group. A sheet title that says “DFW” is not a jurisdiction. If the legal description is Arlington, the amendments to read are Arlington’s, on top of whatever International edition the city has adopted above the Texas municipal floor.
The geology is still the North Texas clay that heaves, so foundation drawings often show piers or a stiffened slab. Measure the schedule on these sheets. Do not borrow a Dallas pier table because the jobsites are forty minutes apart. Hail specifications show up on roofs and on exterior equipment when the spec writer put them there. Entertainment venues, university buildings, and the industrial yards along the highways are common drawing types. Naming those sectors describes the market. It does not mean F&K has a contract with any venue or plant.
Between Dallas and Fort Worth, a lot of the bidding is renovation of older retail and new tilt-wall shells. Those scopes split differently: a shell asks for structure, slab, and site paving; a renovation asks for demolition notes, existing-to-remain, and a clear line between landlord and tenant work. If the set does not draw that line, the estimate should flag it instead of guessing who buys the rooftop units.
Contractor registration is municipal. Trade licenses follow the Texas pattern of state and city programs, which this page will not collapse into one license number. Public bids may carry a wage decision; private bids should not grow one. F&K’s work on an Arlington package is remote. Upload the drawings, the soils report, and the alternates.
On an Arlington shell, count the tilt-wall panels from the structural elevations, the embed plates from the schedule, and the slab joints the way the drawings dimension them. Site paving and fire-lane striping stay in the civil scope unless your trade bid owns them. Entertainment and university renovations usually arrive with a phasing sheet. Price the phase that the bid form names, and list later phases as excluded. Arlington’s building official publishes contractor notices; those notices are not a substitute for the stamped set. We do not enroll you in the city’s notification list.
Arlington bid questions
Will Dallas Development Services review an Arlington address?
No. Arlington’s Planning & Development Services Department is the permit office for parcels inside Arlington. Dallas and Fort Worth have their own departments.
How should a tilt-wall shell be separated from a later tenant fit-out?
Price the shell scope shown, and list tenant items that are mentioned but not drawn as exclusions or alternates. Do not merge two contracts into one lump sum unless the bid form says they are one job.
Is F&K based in Arlington?
No. Estimating is remote and plan-based. The page is a jurisdiction note, not an office listing.