Multnomah County · Portland–Vancouver–Hillsboro · Portland Permitting & Development
Portland submittals go to Permitting & Development, not to a state counter
Portland is in Multnomah County, in the Portland–Vancouver–Hillsboro metro. A parcel on the Washington side of the river is not this city’s permit. Inside Portland, Portland Permitting & Development reviews building, site, and related permits. The 2025 Oregon Structural Specialty Code, on a 2024 IBC base, and the 2026 residential specialty code, on a 2024 IRC base with the 2023 book still usable into early 2027, are the state documents. Portland amends and supplements them. Tree, erosion, and stormwater sheets are often a separate measured scope from the building.
The west-of-the-Cascades climate is wet for much of the year. Roofing, exterior walls, and elevated decks pick up waterproofing and drainage details that a high-desert set will not have. Cascadia seismic design shows up as the lateral system, anchorage, and special inspection notes. Those are structural quantities. Do not add a second seismic percentage after you have counted the shear walls. Floodplain along the Willamette or Columbia matters only for the parcels the flood map and the civil drawings identify.
What gets bid is central-city renovation, close-in multifamily, and industrial buildings along the river and the highways. Saying so is market context. It is not a project history. The Construction Contractors Board license is statewide. Prevailing wage on Oregon public work has no single dollar threshold on the January 2023 chart, and the chart adds tests for renovations and for projects using a large amount of public money. Read the invitation before you lock a labor rate.
F&K does not sit in the Development Services Center and does not pull Portland permits. Send the architectural, structural, and civil sets, including the stormwater report if the bid expects those quantities.
Portland site quantities often include stormwater planters or tanks, street trees, and erosion control that the building estimator did not sell. Keep them in the bid only when the invitation assigns them to you. The structural specialty code and the residential specialty code can both be in play on a mixed project during the overlap that runs to 31 March 2027. Write which book the permit application used. Special inspections for seismic systems are a scope note, not a head-count of inspectors. F&K will not stand in for the inspector.
East-side Portland infill and a Northwest industrial renovation do not share a lateral system or a stormwater detail. Measure each. Vancouver, Washington drawings that a broker stapled to a Portland set are a different state code and a different permit office. Split them before anyone prices a combined lump sum. Inclusionary-housing or system-development-charge figures are owner costs unless the bid form assigns a number. This page will not invent those fees.
Portland bid questions
Is a Vancouver, Washington address permitted by Portland Permitting & Development?
No. Vancouver is in Washington and has its own building official. Portland’s bureau covers Portland. The metro name crosses a state line; the permit does not.
Should stormwater facilities be inside the building takeoff?
Only if your bid form puts them in your scope. Otherwise keep planters, tanks, and piping that the civil drawings assign to the site package out of the building lump sum, and say so.
Will you attend the Portland permit appointment?
No. The work is remote and document-based. We do not represent you before the bureau.