F&K Estimatings Construction Estimating & Takeoffs

Hawaii State Building Code Council

Hawaii Construction Estimating for Steel and Openings

F&K estimates Hawaii work from the drawings you send. There is no Hawaii office, no site walk, and no permit filing.

The Hawaii State Building Code Council adopted 2018 editions, with the state building code on the 2018 IBC and the residential code on the 2018 IRC, between November 2020 and April 2021. Each county then adopts that state code with its own amendments, so Honolulu and Hawaii County are not the same permit review. There is no frost design to speak of.

Zone 1 is the energy placement: tropical marine conditions, hurricane wind, salt-air corrosion on the coast, and seismic plus volcanic exposure on Hawaii Island. Most materials are shipped in. Freight, lead time, and inter-island moves are cost lines the drawings will not quantify; they belong in the assumptions you ask us to carry, not in a made-up percentage.

The Contractors License Board at DCCA licenses contractors. County building departments issue permits. The DOL chart of January 1, 2023 lists a $2,000 prevailing-wage threshold. Hawaii’s general excise tax is a tax on gross receipts, not a mainland-style sales tax added only to materials, so this page does not invent a materials-tax rate. The takeoff is done remotely from the set.

Procurement and labor notes for Hawaii

Hawaii state and county construction procurement follows the project’s solicitation, governing procurement rules, and the location-specific bid documents. The estimate should preserve the applicable county, agency, and project assumptions rather than apply a generic statewide factor.

The State Procurement Office describes a procurement lifecycle for construction and competitive sealed bidding, including public notice, specifications, administrative requirements, and bid due dates. Review the current solicitation and addenda together.

Hawaii’s Department of Labor states that state and county construction projects above the statutory threshold use prevailing wages and certified payroll requirements. Confirm the current wage schedule and classification for the project.

Estimating services and trade scopes

Choose a measured takeoff if you plan to apply your own rates. For a priced bid estimate, agree on the trade boundaries, labor basis, supplier quotes and allowances with your estimator.

Structural steel estimating

On a Hawaii structural steel bid, group members by building and shipment or erection sequence when the tender supplies it. Keep the specified coating system, hardware and field touch-up in the scope so delivered material quotes can be compared.

Door and window takeoff

For a Hawaii enclosure tender, match scheduled door and window types to the specified hardware and corrosion protection. Ask suppliers to identify freight to the project island and keep site handling as a separate agreed pricing input.

What to send and what to request

Bid drawings and inputs
Steel coating spec, opening schedule, destination island and delivery requirements, supplier exclusions.
Estimate deliverable
Steel weight, finish and hardware schedules, with shipment and handling allowances separate from quantities.
Request an estimate for a Hawaii project

Browse estimating services and trades

Find the drawings, quantities and deliverables for your scope. For a Hawaii project, share your bid documents so we can confirm which items belong in the quote.

Hawaii questions before a number is issued

Does the Honolulu amendment apply on a neighbor-island county job?

No. The state code is the base, and each county adopts amendments. Name the county on the estimate.

Why do Hawaii material prices move when the quantities do not?

Because freight and inter-island handling are not in the model-code quantities. They have to be an explicit allowance you confirm, not a hidden factor.

Official references for Hawaii

Compare a marked-up quantity sheet in the sample library before sending a set.