F&K Estimatings Construction Estimating & Takeoffs

Arkansas State Fire Marshal

Arkansas Construction Estimating for Reroofs and Masonry

F&K estimates Arkansas work from the drawings you send. There is no Arkansas office, no site walk, and no permit filing.

The Arkansas Fire Prevention Code, 2021 edition, effective 1 January 2023, is the statewide book. Volume II is the building volume on a 2021 IBC base, and Volume III is the residential volume on a 2021 IRC base. Local amendments still exist, but the starting document is that state code rather than a city-by-city patchwork.

Zones 3 and 4 describe the energy map: humid heat, a real tornado and hail season, and New Madrid seismic influence in the northeast corner. Those hazards change roofing, openings, and anchorage only where the structural notes invoke them. Shallow frost means the footing depth is usually set by bearing soil, not by a deep frost line.

Contractor licensing runs through the Arkansas Contractors Licensing Board. Permits are local. DOL’s January 2023 threshold table does not include an Arkansas prevailing-wage law; the repeal was in 2017. Put a federal wage decision in the labor recap only when the bid documents attach one. Estimating is remote and based on the plan set.

Procurement and labor notes for Arkansas

Arkansas projects may combine statewide rules with local authority requirements. Use the project address, adopted code information, drawings, specifications, and bid instructions to identify the assumptions that belong in the takeoff.

The Arkansas procurement rule reviewed describes competitive sealed bidding for construction-related purchases above its stated threshold and competitive quotes for lower ranges in the covered program. The actual owner and solicitation determine the applicable process.

Arkansas rules identify Davis-Bacon requirements for federally funded or assisted construction and direct users to the applicable federal wage determination. Confirm funding, construction classification, and wage schedule from the bid documents.

Estimating services and trade scopes

Choose a measured takeoff if you plan to apply your own rates. For a priced bid estimate, agree on the trade boundaries, labor basis, supplier quotes and allowances with your estimator.

Roofing takeoff

For an Arkansas roof tender with specified wind-rated assemblies, measure roof zones, perimeters and penetrations separately. Send the fastening details so field attachment, edge metal and equipment curb interfaces are carried in the right package.

Masonry estimating

When a northeast Arkansas structural set calls for reinforced masonry, send the wall elevations and reinforcing details. Count grouted cells, bond beams and embeds separately so the wall takeoff can be checked against the lateral details.

What to send and what to request

Bid drawings and inputs
Roof plan and existing condition survey, elevations, wall sections and reinforcement details.
Estimate deliverable
Roof zones and accessory schedule, CMU area and grout and rebar workbook, unit-price repair items.
Request an estimate for a Arkansas project

Browse estimating services and trades

Find the drawings, quantities and deliverables for your scope. For a Arkansas project, share your bid documents so we can confirm which items belong in the quote.

Arkansas questions before a number is issued

Is the Arkansas code a fire code only?

The title is the Fire Prevention Code, and it includes building and residential volumes based on the 2021 I-Codes, effective at the start of 2023. Use the volume that matches the occupancy.

Do public jobs in Arkansas carry a state wage scale?

Not under a general state prevailing-wage law. The 2017 repeal is reflected in the DOL chart of January 2023. Federal assistance is a separate question answered by the solicitation.

Official references for Arkansas

Compare a marked-up quantity sheet in the sample library before sending a set.