F&K Estimatings Construction Estimating & Takeoffs

Jefferson County · Birmingham–Hoover · Department of Planning, Engineering & Permits

Birmingham permits are a city review inside a state without one building code

Birmingham is in Jefferson County, in the Birmingham–Hoover metro. Permits inside the city go through the Department of Planning, Engineering & Permits. Hoover, Homewood, and unincorporated Jefferson County are not that counter. Alabama does not impose one building code on every private job. The Energy and Residential Codes Board’s 2015 residential code is the housing reference many jurisdictions start from, while state-regulated buildings such as many schools follow the Division of Construction Management’s later IBC-based book. Birmingham’s own adoption can be a third document. The cover sheet has to say which one this set used.

The climate is hot and humid, in IECC zones 2 and 3, with tornado and severe-storm exposure rather than a coastal hurricane code. Frost rarely sets the footing. Moisture control, roofing, and mechanical tonnage are the lines that grow relative to a dry climate, and only to the extent the equipment schedules and wall types show them. Medical and university buildings around the city, and older industrial structures, are common drawing types. That is market context. It is not a claim of a contract with any hospital or mill.

The Alabama Licensing Board for General Contractors licenses commercial builders. The permit is still the city’s. The January 2023 federal chart does not list an Alabama prevailing-wage law. A federally assisted project can still include a Davis-Bacon decision in the book. Do not paste one onto a private clinic fit-out.

F&K does not occupy space in Birmingham and does not submit the permit. Send the drawings, the code year the architect used, and the geotech if the foundation is anything other than a simple slab on the architectural plan.

When a Birmingham renovation includes both a historic facade and a new interior, keep restoration quantities off the new-build tally. Limestone or brick repair specified by area is not a full-wall replacement. If the structural set upgrades an old frame for wind or for a new occupancy, count the new members from the framing plans and leave the existing structure as existing-to-remain unless demolition sheets say otherwise. Medical-campus additions often arrive with interim-life-safety notes. Those notes are phasing constraints, not extra square footage, unless they draw temporary partitions.

Birmingham sample sheets

Birmingham bid questions

Does a Hoover permit follow Birmingham’s amendments?

No. Hoover has its own building department. Birmingham’s Department of Planning, Engineering & Permits covers Birmingham. The metro name is not the jurisdiction.

Is there an Alabama state wage to use on a Birmingham school?

Not a general state prevailing-wage rate. Some schools are state-regulated for the building code and still need the solicitation checked for federal wage rules. Private work does not inherit a state scale.

Will you walk a Birmingham building before the takeoff?

No. Work is remote and based on the plans. If existing conditions are not drawn, they are exclusions, not assumptions we invent after a visit we will not make.

Birmingham drawing upload

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.