F&K ESTIMATINGS — INDUSTRIAL ESTIMATING SCOPE CHECKLIST Use this checklist to describe the bid package for a written project quote. PROJECT AND PACKAGE Project location / ZIP: Plant or process area: Contractor / contact: Bid deadline: Requested systems, trades and work-package boundaries: Output: quantities only / priced contractor estimate / preliminary budget / revision review Required breakdown: trade / system / area / line or equipment tag / client cost codes DOCUMENT REGISTER Document title / sheet or line list: Issue / revision / date: Included P&IDs and process documents: Dimensioned layouts / general arrangements / isometrics: Equipment, electrical and cable schedules: Specifications, addenda and owner bid form: Missing information and proposed clarifications: QUANTITY AND PRICING BASIS Pipe size, material class and schedule: Fittings, valves, supports, insulation and documented joints: Equipment tags and vendor inclusions: Concrete, reinforcement, formwork, steel, feeders, controls and connections requested: Measured quantities and original units: Separate waste / purchasing allowances and rounding basis: For priced estimates: material, labor and equipment rate sources, date and location: Contractor-provided crew / productivity / shift assumptions: Vendor quotations, validity dates, exclusions and scope gaps: Indirects, taxes, bonds, overhead, profit and contingency requested: EXISTING PLANT AND RESPONSIBILITIES Tie-in points / demolition boundaries / existing-condition information: Shutdown windows / permitted shifts / access restrictions: Vendor supply versus field installation responsibilities: Testing, commissioning, temporary work and specialist quotations requested: Items by others / exclusions / unresolved allowances: DELIVERY AND REVISION REVIEW Required editable workbook and drawing markup format: Previous and replacement document issues, if requesting a revision: Affected line or equipment tags and quantity / rate changes: Named preparer / review contact / authorized release contact: Included revision coverage and delivery date to confirm in the proposal: P&IDs alone do not establish all measurable installed route lengths. Engineering approval, hazardous-area classification, lift planning, shutdown management and field verification remain with the responsible designer, contractor or plant team. This checklist contains no project quantities, rates, fee or delivery commitment. Service: https://fandkestimatings.us/services/industrial-estimating/ Enquiries: https://fandkestimatings.us/contact/